HOTPOINT FabricCare C HD 84M WBS UK WiFi-enabled 8 kg Heat Pump Tumble Dryer - White
Capacity: 8 kg
Energy rating: A+++
Sensor drying to save you time and energy
Save energy with the eco-cycle
Product code: 628554

This Hotpoint tumble dryer's PetHairCare cycle uses a burst of steam to lift away pet hair. It traps it in the filter, so your clothes come out hair-free. ColdGuard keeps the dryer running safely and efficiently, even in chilly areas like garages and outbuildings. Perfect for freeing up some space in your kitchen. And its Heat Pump technology dries your clothes using lower temperatures. It uses less energy and it's kinder to your fabrics so they look like new for longer.

Good to know

- Download the HomeWhiz app and control your tumble dryer from your phone
- FastDry will have a 5 kg load ready to wear in just an hour – perfect for busy family life
- Its easy clean filter is built into the door for quick and convenient maintenance of your dryer
- DelicateDry gently dries at a lower temperature to protect fabrics from shrinking and damage
- Choose from 15 drying programs including Cotton, Wool and Jeans

Technical specifications for HOTPOINT FabricCare C HD 84M WBS UK WiFi-enabled 8 kg Heat Pump Tumble Dryer - White

OVERVIEW

Type
Freestanding tumble dryer
Manufacturer’s guarantee
- 1 year labour
- 10 years parts
Colour
White

PERFORMANCE

Drying type
Heat pump
Noise level
63 dB(A)
Annual energy consumption
176.8 kWh
Energy consumption per cycle
- Full load: 1.44 kWh
- Half load: 0.81 kWh
Drying capacity
8 kg
Energy efficiency class
A+++
Condensation efficiency class
B
Power consumption
- Standby mode: 0.47 W
- Off mode: 0.47 W
Drying time for a cotton cycle
- Full load: 174 minutes
- Half load: 108 minutes

FEATURES

Loading
Front loading
Fluff filter
Yes
Other features
Child lock

CONTROLS

Display
LED screen
Delay timer
Yes
Programme selector
Dial

DRYING

Programs
- Baby
- Cotton
- DelicateDry
- Duvet
- Eco
- Fast Dry 5kg
- Jeans
- Mixed
- PetHairCare
- Refresh
- Remote cycle
- Silent Cycle
- Sport
- Synthetics
- Timed drying
- Wool
Number of drying temperatures
2
Number of programs
15
Weight
45.5 kg
Dimensions
846 x 598 x 607 mm (H x W x D)
Boxed dimensions
885 x 650 x 630 mm (H x W x D)
Boxed weight
46.5 kg
Stacking option
Yes
Box contents
Hotpoint FabricCare C HD 84M WBS UK WiFi-enabled 8 kg Heat Pump Tumble Dryer

SMART

Compatible app
HomeWhiz app
Smart functions
- Remote drying start
- Settings
- Updates